{"id":1355,"date":"2017-07-27T19:13:02","date_gmt":"2017-07-27T18:13:02","guid":{"rendered":"https:\/\/ambtunisi.esteri.it\/news\/dall_ambasciata\/2017\/07\/sara-un-azienda-italiana-ternienergia-2\/"},"modified":"2017-07-27T19:13:02","modified_gmt":"2017-07-27T18:13:02","slug":"sara-un-azienda-italiana-ternienergia-2","status":"publish","type":"post","link":"https:\/\/ambtunisi.esteri.it\/fr\/news\/dall_ambasciata\/2017\/07\/sara-un-azienda-italiana-ternienergia-2\/","title":{"rendered":"Une soci\u00e9t\u00e9 italienne, TerniEnergia S.p.A., r\u00e9alisera la premi\u00e8re centrale photovolta\u00efque dans le d\u00e9sert tunisien"},"content":{"rendered":"<p style=\"text-align: justify;\">Le 24 juillet 2017 a \u00e9t\u00e9 inaugur\u00e9 \u00e0 Tozeur, en pr\u00e9sence de la Ministre de l\u2019Energie H\u00e9la Cheikhrouhou, du Pr\u00e9sident de la STEG, Moncef Harrabi, du Gouverneur de Tozeur, Mounir Hamdi, ainsi que des repr\u00e9sentants de la Kreditanstalt fur Wiederaufbau, le chantier pour la construction de la <strong>premi\u00e8re centrale photovolta\u00efque \u00e0 \u00e9chelle industrielle en Tunisie<\/strong>, d\u2019une capacit\u00e9 de 10MW, qui sera achev\u00e9 au cours de l\u2019ann\u00e9e 2018 par une soci\u00e9t\u00e9 italienne, TerniEnergia SpA.<\/p>\n<p style=\"text-align: justify;\">Il s\u2019agit d\u2019un projet de 12,5 millions de dollars avec lequel la Tunisie vise \u00e0 diversifier les sources d\u2019approvisionnement \u00e9nerg\u00e9tique et \u00e0 accroitre l\u2019ind\u00e9pendance des combustibles fossiles, en valorisant<strong> l\u2019\u00e9norme potentiel du Pays en mati\u00e8re d\u2019\u00e9nergies renouvelables<\/strong>, solaire et \u00e9olienne. Il ne s\u2019agit que d\u2019une premi\u00e8re d\u2019une s\u00e9rie d\u2019investissements, pr\u00e9vus dans le \u00ab Plan solaire tunisien \u00bb qui permettront la r\u00e9alisation de centrales d\u2019une puissance de 1000 MWh, dont 650 de photovolta\u00efque, d\u2019ici 2020.<\/p>\n<p>\u00a0<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"resource\/img\/2017\/07\/24.jpg\" alt=\"24\" width=\"336\" height=\"240\" \/>\u00a0 \u00a0\u00a0<img loading=\"lazy\" decoding=\"async\" src=\"resource\/img\/2017\/07\/93.jpg\" alt=\"93\" width=\"332\" height=\"237\" \/><\/p>\n<p>\u00a0<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" style=\"display: block; margin-left: auto; margin-right: auto;\" src=\"resource\/img\/2017\/07\/126.jpg\" alt=\"126\" width=\"634\" height=\"453\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"Le 24 juillet 2017 a \u00e9t\u00e9 inaugur\u00e9 \u00e0 Tozeur, en pr\u00e9sence de la Ministre de l\u2019Energie H\u00e9la Cheikhrouhou, du Pr\u00e9sident de la STEG, Moncef Harrabi, du Gouverneur de Tozeur, Mounir Hamdi, ainsi que des repr\u00e9sentants de la Kreditanstalt fur Wiederaufbau, le chantier pour la construction de la premi\u00e8re centrale photovolta\u00efque \u00e0 \u00e9chelle industrielle en Tunisie, [&hellip;]","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"tags":[],"class_list":["post-1355","post","type-post","status-publish","format-standard","hentry"],"_links":{"self":[{"href":"https:\/\/ambtunisi.esteri.it\/fr\/wp-json\/wp\/v2\/posts\/1355","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ambtunisi.esteri.it\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ambtunisi.esteri.it\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ambtunisi.esteri.it\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ambtunisi.esteri.it\/fr\/wp-json\/wp\/v2\/comments?post=1355"}],"version-history":[{"count":0,"href":"https:\/\/ambtunisi.esteri.it\/fr\/wp-json\/wp\/v2\/posts\/1355\/revisions"}],"wp:attachment":[{"href":"https:\/\/ambtunisi.esteri.it\/fr\/wp-json\/wp\/v2\/media?parent=1355"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ambtunisi.esteri.it\/fr\/wp-json\/wp\/v2\/tags?post=1355"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}